250m以上超高层建筑消防给水系统加强措施探讨
Discussion on the strengthen measures of fire water supply system for super high-rise building above 250m
【摘要】 通过总结杭州某300m超高层项目消防设计中的加强措施,介绍了针对250m以上超高层建筑消防给水设计双路供水及自动喷水灭火系统报警阀组环状供水的实现和解决方案,并对与之相关的规范条文及问题进行探讨。
【Abstract】 Through summarizing the strengthen measures in fire water supply system design of Hangzhou 300 mproject,this paper introduces the achievements and solutions of dual water supply in fire water supply system and looped water supply of alarm valves in sprinkler system for super high-rise buildings above 250 m,and probes into the relevant codes and questions.
【关键词】 超高层;
消防给水;
加强措施;
双路供水;
环状供水;
【Key words】 Super high-rise building; Fire water supply system; Strengthen measure; Dual water supply; Looped water supply;
【Key words】 Super high-rise building; Fire water supply system; Strengthen measure; Dual water supply; Looped water supply;
- 【文献出处】 给水排水 ,Water & Wastewater Engineering , 编辑部邮箱 ,2020年06期
- 【分类号】TU892
- 【被引频次】4
- 【下载频次】336