运用PERT技术合理确定项目建设投资研究

Research on the Reasonable Determination of Project Construction Investment with PERT Technology

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 张曦

【Author】 ZHANG Xi;Fuzhou Planning Design and Research Institute;

【机构】 福州市规划设计研究院

【摘要】 为合理确定项目建设投资,避免"三超"现象发生,在剖析传统统一固定费率制计算项目基本预备费的缺点和局限性基础上,提出以合理确定基本预备费取费基数中各项费用金额为基础,充分考虑其置信等级和置信区间,结合PERT技术采用个别浮动制方式计算项目基本预备费及确定费率。

【Abstract】 In order to reasonably determine the investment for the construction of a project and to avoid the occurrence of the phenomenon of "three excesses",and on the basis of an analysis of the shortcomings and limitations of the traditional unified fixed rate system for calculating the basic reserve cost of a project,this paper proposes to reasonably determine the amount of various expenses in the basic reserve fee withdrawal base. Taking into account the confidence level and confidence interval of the various costs,the basic preparation cost of the project is calculated and the rate is determined by individual floating method combined with PERT technology.

  • 【文献出处】 建筑经济 ,Construction Economy , 编辑部邮箱 ,2020年02期
  • 【分类号】F426.92
  • 【被引频次】8
  • 【下载频次】342