某厂600 MW机组汽水管道应力分析及支吊架调整

Stress Analysis of Steam-water Pipelines and Adjustment of Supports and Hangers of A 600 MW Turbine Generator

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 郭永峰季诚王英俊

【Author】 GUO Yongfeng;JI Cheng;WANG Yingjun;Datang International Yuncheng Power Generation Co., Ltd.;North China Electric Power Research Institute Inc.;Beijing Huaketonghe Technology Co., Ltd.;

【机构】 大唐国际运城发电有限责任公司华北电力科学研究院北京华科同和科技有限公司

【摘要】 某电厂2号机组运行中,检查发现四大管道支吊架存在若干缺陷。以冷再管道为例,根据其实际运行状态,对管系进行了强度核算;按照计算结果,对管系支吊架进行了调整,保证了管系和机组的安全稳定运行。

【Abstract】 During the normal operation of unit 2 in a power plant,some defects are found in the four pipeline supports and hangers. In this paper,cold section of reheat pipe is taken as an example,according to its actual operation status,the strength of piping system is calculated,according to the computational results,the supports and hangers of piping system are adjusted to ensure a safe and stable operation of piping system and unit.

  • 【文献出处】 山西电力 ,Shanxi Electric Power , 编辑部邮箱 ,2020年02期
  • 【分类号】TM621
  • 【被引频次】1
  • 【下载频次】99