节点文献

鸭涌河综合整治工程——过澳边界跨河供水管关键技术分析

Yachong River Comprehensive Regulation Project——Analysis of Key Technologies for Cross-river Water Supply Pipe on border of Macou

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 孙安史慧婷赖德贤陈位洪

【Author】 SUN An;SHI Huiting;LAI Dexian;CHEN Weihong;

【机构】 广东省建筑设计研究院广州市城市规划勘测设计研究院

【摘要】 伴随环境治理需要,很多时候需在河涌中新建大型污水渠箱。渠箱如何穿越重要的跨河建构筑物有时是工程能否顺利推进的关键所在。以鸭涌河综合整治工程为例,分析过澳边界跨河供水管存在的难题,提前对现有供水管进行保护,改渠箱为钢管,变开挖为非开挖,采用一次性闷顶方式顺利顶进,可为类似工程提供参考。

【Abstract】 With the need of environmental governance, it is necessary to build a new large sewer canal box in the river. How does the canal box cross the important river crossing structures is sometimes the key to the smooth progress of the project. Taking the Yachong River Comprehensive Regulation Project as an example, the difficulties of the cross-river water supply pipe on the border of Macau are analyzed. The existing water supply pipe is protected in advance. The canal box is changed into the steel pipe. The excavation is changed into the trenchless. The one-time direct pipe jacking method is adopted, which can provide reference for similar projects.

  • 【文献出处】 城市道桥与防洪 ,Urban Roads Bridges & Flood Control , 编辑部邮箱 ,2020年12期
  • 【分类号】TU991.36
  • 【下载频次】28
节点文献中: 

本文链接的文献网络图示:

本文的引文网络