节点文献
基于斜推式风机安装船的风机整机安装方法研究
Research on Integrated Installation of Wind Turbine Based on Inclined Installation Vessel
【摘要】 风能具有储量大、分布广、无污染的特性,风能发电是目前最为成熟的可再生能源利用方式,在世界范围内得到了广泛关注。海上风电具有风能资源稳定丰富、开发不占用土地、单机发电量大等优势,近年来逐渐成为风能开发的热点。传统海上风电安装方法效率低、成本高,且受限于风机安装船的起吊能力,已逐渐不能满足海上风电规模化、深海化、大型化的发展要求。针对现有风机安装方法存在的不足,结合海洋平台浮托安装方法的理念,本文提出了一种能够自行运输风机且能实现风机整体安装的新型、高效的风机安装方法和风机安装船设计概念,并利用专业水动力分析软件ANSYS-AQWA进行了新型风机安装船的水动力分析,同时开展了相关的可行性分析。
【Abstract】 Wind power generation has been widely concerned in the world. Traditional installation method of offshore wind power has low efficiency, high cost, and is limited by the lifting capacity of the installation vessel. By reference to the float-over installation method, this paper proposed a new and efficient installation method of wind turbine and a design concept of the wind turbine installation vessel which can transport wind turbine by itself and realize the integrated installation of wind turbine. The professional software ANSYS-AQWA is used to carry out hydrodynamic analysis of the new type of wind turbine installation vessel,and related feasibility analysis is also carried out.
【Key words】 offshore wind power; wind turbine installation vessel; float-over integrated installation of the wind turbine; horizontal transport of the integrated wind turbine;
- 【文献出处】 中国造船 ,Shipbuilding of China , 编辑部邮箱 ,2019年04期
- 【分类号】P752;TM315
- 【被引频次】3
- 【下载频次】183