节点文献

BIM技术在北京地铁19号线一期工程中的管理应用与实践

Management application and practice of BIM technology in phase I project on Beijing subway line 19

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【摘要】 目前北京地铁建设正处于高速发展时期,应用BIM技术和管理方式,从建设管理、勘察设计、施工、运营等各个阶段提升城市轨道交通工程的精细化和信息化水平显得十分必要和迫切。通过对BIM技术在轨道交通行业应用情况进行研究和总结,并以北京地铁19号线BIM技术应用为例,介绍北京地铁的信息化实践过程,为轨道交通进一步应用BIM技术提供参考和借鉴。

【Abstract】 At present, the construction of Beijing Subway is in a rapid development period. With the aid of BIM technology and BIM management mode, it is very necessary and urgent to improve the refinement and informatization level of urban rail transit engineering from the construction management, survey and design,construction, operation and all other stages. This paper studies and summarizes the application status and development trend of BIM technology and the application of BIM in rail transit industry. Taking the implementation of BIM technology in Beijing subway line 19 as an example, it expounds the informatization practice process of Beijing subway, and provides references for further application of BIM technology.

【关键词】 地铁BIM技术管理应用
【Key words】 subwayBIM technologymanagement application
  • 【文献出处】 现代城市轨道交通 ,Modern Urban Transit , 编辑部邮箱 ,2019年06期
  • 【分类号】U231.3
  • 【被引频次】12
  • 【下载频次】193
节点文献中: 

本文链接的文献网络图示:

本文的引文网络