风景区取水泵房改建工程设计
Design of Reconstruction Project of Pumping Station in Scenic Area
【摘要】 某取水泵房位于风景区,因为取水头部位置不合理、水泵充水方式不便捷等原因严重影响水厂正常生产,同时其尺寸及外形也影响了风景区景观,因此亟需改建。改建工程设计中,根据水下地形和河流走向重新选择了取水头部位置并优化了其尺寸;同时通过取消泵房进水间,特别是通过创新的大型设备二次起吊等方法成功地减少了泵房地面体量,从而使新建泵房基本满足了与周边景观相协调的要求。
【Abstract】 An intake pumping station was located in a scenic area,which had a serious impact on the normal production of the water plant due to the unreasonable position of the intake head and the inconvenient way of filling water to the pump,etc. Meanwhile,its structure size and shape could not meet the higher requirements of the scenic area for the landscape,so it was urgent to be transformed.According to the underwater topography map and river direction, the position of intake head was re-determined and its size was optimized. At the same time,the volume of the pumping station was reduced successfully by cancelling the inlet room of the pump station,especially by means of second lifting of large equipment,so that the new pumping station could basically meet the requirements of coordination with the surrounding landscape.
- 【文献出处】 中国给水排水 ,China Water & Wastewater , 编辑部邮箱 ,2019年08期
- 【分类号】TU991.35
- 【下载频次】69