高炉热风管道拉紧装置设计

Design for Tension Device of Warm-air Pipe for Blast Furnace

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 赵惠敏邢铭隋阳

【Author】 Zhao Hui-min;Xing Ming;Sui Yang;Design and Research Institute of Baotou Iron & Steel ( Group) Corp.;Tiejie Logistics Co.of Baotou Iron & Steel ( Group) Co.,Ltd.;

【机构】 包钢集团设计研究院包钢(集团)公司铁捷物流公司

【摘要】 文章分析了包钢7#、8#高炉投产之后热风管系补偿器破损情况及原因,提出了增加热风支管大拉杆的设计方案。拉杆采用4根Φ150 mm实心圆钢分段式安装于热风支管,以延长热风管系中波纹补偿器的使用寿命。

【Abstract】 In the paper,it is analyzed the damages of compensator in warm-air pipe system and their causes since the7#and 8#blast furnaces of Baotou Steel were put into operation as well as proposed the design scheme of incresing the large pull rod of warm-air branch pipe. The pull rod is with four sticks of solid round steel with Φ150 mm and installed to warm-air branch pipe with sectional type in order to prolong the service life of ripple compensator in warm-air pipe system.

【关键词】 高炉热风炉管道大拉杆
【Key words】 blast furnaceair heating furnacelarge pull rod of pipe
  • 【文献出处】 包钢科技 ,Science & Technology of Baotou Steel , 编辑部邮箱 ,2019年05期
  • 【分类号】TF573
  • 【下载频次】54