In order to speed up the numerical modeling and water hammer calculation of the parallel water conveyance system of power stations during the simultaneous load rejection in the early design stage,the equivalent simplification model for water hammer calculation of the parallel branch pipes and the parallel turbines were deduced based on the pipeline water hammer equation and the boundary condition of the turbine. Thus,the parallel power generation system,i.e. one tunnel for multiple units,could be simplified...