节点文献

Thermal analysis of EAST neutral beam injectors for long-pulse beam operation

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 胡纯栋许永建谢远来谢亚红梁立振蒋才超刘胜韦江龙盛鹏刘智民陶玲the NBI Team

【Author】 Chundong HU;Yongjian XU;Yuanlai XIE;Yahong XIE;Lizhen LIANG;Caichao JIANG;Sheng LIU;Jianglong WEI;Peng SHENG;Zhimin LIU;Ling TAO;the NBI Team;Institute of Plasma Physics, Chinese Academy of Sciences;

【机构】 Institute of Plasma Physics, Chinese Academy of Sciences

【摘要】 Two sets of neutral beam injectors(NBI-1 and NBI-2) have been mounted on the EAST tokamak since 2014. NBI-1 and NBI-2 are co-direction and counter-direction, respectively. As with indepth physics and engineering study of EAST, the ability of long pulse beam injection should be required in the NBI system. For NBIs, the most important and difficult thing that should be overcome is heat removal capacity of heat loaded components for long-pulse beam extraction. In this article, the thermal state of the components of EAST NBI is investigated using water flow calorimetry and thermocouple temperatures. Results show that(1) operation parameters have an obvious influence on the heat deposited on the inner components of the beamline,(2) a suitable operation parameter can decrease the heat loading effectively and obtain longer beam pulse length, and(3) under the cooling water pressure of 0.25 MPa, the predicted maximum beam pulse length will be up to 260 s with 50 keV beam energy by a duty factor of 0.5. The results present that, in this regard, the EAST NBI-1 system has the ability of long-pulse beam injection.

【Abstract】 Two sets of neutral beam injectors(NBI-1 and NBI-2) have been mounted on the EAST tokamak since 2014. NBI-1 and NBI-2 are co-direction and counter-direction, respectively. As with indepth physics and engineering study of EAST, the ability of long pulse beam injection should be required in the NBI system. For NBIs, the most important and difficult thing that should be overcome is heat removal capacity of heat loaded components for long-pulse beam extraction. In this article, the thermal state of the components of EAST NBI is investigated using water flow calorimetry and thermocouple temperatures. Results show that(1) operation parameters have an obvious influence on the heat deposited on the inner components of the beamline,(2) a suitable operation parameter can decrease the heat loading effectively and obtain longer beam pulse length, and(3) under the cooling water pressure of 0.25 MPa, the predicted maximum beam pulse length will be up to 260 s with 50 keV beam energy by a duty factor of 0.5. The results present that, in this regard, the EAST NBI-1 system has the ability of long-pulse beam injection.

【基金】 the NBI team
  • 【文献出处】 Plasma Science and Technology ,等离子体科学和技术(英文版) , 编辑部邮箱 ,2018年04期
  • 【分类号】TL631.24
  • 【下载频次】35
节点文献中: 

本文链接的文献网络图示:

本文的引文网络