节点文献

Pre-reinforcement grout in fractured rock masses and numerical simulation for optimizing shrinkage stoping configuration

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 于少峰吴爱祥王贻明李涛

【Author】 YU Shao-feng;WU Ai-xiang;WANG Yi-ming;LI Tao;School of Civil and Resource Engineering, University of Science and Technology Beijing;Key Laboratory of High-Efficient Mining and Safety of Metal of Ministry of Education,University of Science and Technology Beijing;

【机构】 School of Civil and Resource Engineering University of Science and Technology BeijingKey Laboratory of High-Efficient Mining and Safety of Metal of Ministry of Education University of Science and Technology Beijing

【摘要】 Proper room and pillar sizes are both critical factors for safe mining and high ore recovery rate in shrinkage stoping mining of underground metal mines. The rock masses of Tangdan copper mine of China are fractured, which needs much reinforcement and support prior to mining. Cement-sodium silicate grout technology was selected, then its related parameters such as grout pressure, diffusion radius and time were calculated and proposed. In order to test the effect of the pressured grout in the fractured No.4 ore block, field experiments were conducted. To optimize stoping configuration, three-dimensional numerical simulation with ANSYS and FLAC 3 D softwares was proposed. The results show that the drilling porosity and mechanical properties of the rock masses are increased obviously. After grout, ore recovery rate is increased by 10.2 % employing the newly designed stoping configuration compared with the previous. Last, analyzed from the surface movements, roof subsidence and the maximum principal stress of the pillars, the mining safety is probable of being ensured.

【Abstract】 Proper room and pillar sizes are both critical factors for safe mining and high ore recovery rate in shrinkage stoping mining of underground metal mines. The rock masses of Tangdan copper mine of China are fractured, which needs much reinforcement and support prior to mining. Cement-sodium silicate grout technology was selected, then its related parameters such as grout pressure, diffusion radius and time were calculated and proposed. In order to test the effect of the pressured grout in the fractured No.4 ore block, field experiments were conducted. To optimize stoping configuration, three-dimensional numerical simulation with ANSYS and FLAC 3 D softwares was proposed. The results show that the drilling porosity and mechanical properties of the rock masses are increased obviously. After grout, ore recovery rate is increased by 10.2 % employing the newly designed stoping configuration compared with the previous. Last, analyzed from the surface movements, roof subsidence and the maximum principal stress of the pillars, the mining safety is probable of being ensured.

【基金】 Projects(51374034,51674012) supported by the National Natural Science Foundation of China;Project(2013BAB02B05) supported by the China National Science and Technology Support Program during the 12th Five-Year Plan Period
  • 【文献出处】 Journal of Central South University ,中南大学学报(英文版) , 编辑部邮箱 ,2017年12期
  • 【分类号】TD35
  • 【被引频次】3
  • 【下载频次】51
节点文献中: 

本文链接的文献网络图示:

本文的引文网络