节点文献
现代有轨电车平面控制网复测处理
Retest Processing of Tram Plane Control Network
【摘要】 结合现代有轨电车工程平面控制网复测的实例,介绍控制网复测方法。结合统计图表直观分析控制网起算点对点位较差的影响,选择最佳计算方案,确保计算成果最优化。对类似复测控制网项目总结并提出建议,具有指导作用。
【Abstract】 Combined with the plane control network re-test example of the actual tram project,this paper introduces the re-testing method of control network,and analyzes the influence of the starting point of the control network on the point location difference with the statistical chart,and selects the best calculation scheme to ensure the optimization of the calculation result.It is instructive to summarize and make recommendations on similar re-test control network projects.
【关键词】 控制网复测;
2D约束平差;
精度分析;
【Key words】 control network retest; 2D constraint adjustment; precision analysis;
【Key words】 control network retest; 2D constraint adjustment; precision analysis;
- 【文献出处】 中国市政工程 ,China Municipal Engineering , 编辑部邮箱 ,2017年05期
- 【分类号】U492.433
- 【下载频次】23