As the basic principle used in modern underground engineering, the New Austrian Tunneling Method focuses on providing timely and optimized safe support to develop the maximum self-supporting capacity of the rock or soil itself for the stability of the underground opening. But up to now, no reliable formula and theoretical guidance for timely support have been established. The support time can only be empirically determined based on the in-situ monitoring measurements. The timely and optimized support which ...