Focusing on the batch scheduling problem of continuous casting and rolling production line in a steel mill of Hebei province,the width,thickness and hardness were selected as the jump penalty function,and the multi-objective model of hot rolling batch scheduling was established by taking minimum jump penalty,maximum rolling length and minimum idle time as optimization objectives. To avoid the selection of weight coefficient caused by the different magnitude,hot rolling batch planning problem was transformed...