The joint optimization scheduling of cascade reservoir group is an important mean to cope with drought in the complex river basin.According to the characteristics of water and water consumption in the arid years of the Yellow River,the optimal dispatching model of the Yellow River cascade reservoir group to cope with drought was constructed. Taking the node water supply weight and the reservoir storage process as the decision variables,through long series simulation-optimization calculation,the relationship...