基于公路工程施工水平的定额测定对象选择方法

A Quota Measurement Object Selection Method Based on Highway Construction Level

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 李玉敏姚玉玲

【Author】 LI Yu-min;YAO Yu-ling;School of Highway,Chang’an University;China Gezhouba Group Highway Operation Co.,Ltd.;

【机构】 长安大学公路学院中国葛洲坝集团公路运营有限公司

【摘要】 为了更合理地选取公路工程施工定额测定对象,针对目前定额测定对象确定时缺乏定量化方法的问题,在假定定额的测定对象均能满足施工要求的正常条件前提下,采用综合评价公路工程施工水平的方法对施工定额测定对象选择进行研究。从项目部、施工班组、施工现场条件3方面分析了项目施工水平的影响因素,在此基础上结合德尔菲法依据专家多次评分结果建立了包含目标层、一级指标及二级指标的公路工程施工水平影响因素三层次评价指标体系;分别采用主观赋权的IAHP法和客观赋权的粗糙集法计算得到各自的指标权重值,且基于此权重值建立了IAHP-粗糙集综合评价模型,利用组合权重对待选测定对象的生产水平进行定量化综合评价,并根据评价结果来进行定额测定对象的选取,提高了施工定额测定对象选择与定额水平评价的可靠性。通过某施工企业制定定额时,对能满足正常施工条件的7个项目采用IAHP-粗糙集综合评价模型进行实例验证,验证结果表明,综合评价结果能够较为准确地反映实际施工生产水平。

【Abstract】 In order to select the quota measurement objects of highway construction more reasonably,in view of the problem of lacking quantitative measurement method when determine quota measurement object at present,under the premise of assuming the quota measurement objects fulfill construction requirements,the selection of the measurement object is studied by using the method of evaluating highway engineering construction level synthetically. The influencing factors of project construction levels are analysed from the aspects of project department,construction team and site conditions. On this basis,a 3-level evaluation system that containing target layer,first-level indicators and second-level indicators is set up according to Delphi method and experts ’ multiple scoring results. Different index weight values are calculated by subjectively weighted IAHP method and objectively weighted rough set method,and an IAHP-rough set comprehensive evaluation model is set up accordingly. The production level of the measurement objects to be selected is quantitatively evaluated by combination weights,and the quota measurement objects are selected based on the evaluation result, thus the reliability of the selection of the measurement objects and the evaluation of quota levels are improved. During the process of determining the quota for constructionenterprise,the IAHP-rough set comprehensive evaluation model is used to verify the 7 projects that can meet the normal construction conditions,the verification result shows that the comprehensive evaluation result can reflect the actual construction levels accurately.

【基金】 中央高校基本科研业务费专项资金项目(CHD2011ZD006);四川省交通运输厅科技项目(2011A7-4-1)
  • 【文献出处】 公路交通科技 ,Journal of Highway and Transportation Research and Development , 编辑部邮箱 ,2017年09期
  • 【分类号】U415.13
  • 【被引频次】5
  • 【下载频次】120