一种分阶段递进式BIM构建方法
A Phased and Progressive Modeling Method of BIM
【摘要】 近十年来,BIM技术得到了快速发展。但由于建筑业的多参与方特性,目前跨阶段的信息传递仍难以实现,包括建筑全生命期各阶段信息的完整BIM仍无法构建。针对以上问题,提出一种分阶段递进式BIM构建方法,包括协同建模的基本协议和基本流程,支持各参与方在统一的框架下协同构建BIM。应用表明,分阶段递进式BIM建模方法可有效避免BIM构建过程中的重复建模、信息不一致等问题,逐步构建完整、一致的BIM,支持面向建筑全生命期的BIM应用。
【Abstract】 BIM technology has been rapidly developed over the past 10 years.However, it’s still difficult to deliver information smoothly between different phases due to that there are many participants involved in a building project.Consequently, a completed BIM still can’t be constructed.To address this problem, this paper proposes a phased and progressive modeling method(PPMM) of BIM, together with a basic agreement for cooperative modeling among all participants, and modeling procedures.The method supports various participants to cooperatively create BIM under a unified framework.Being verified by a real project, the PPMM is effective for preventing from repetitive modelling and inconsistent data, and is helpful for generating a completed and consistent BIM in BIM database, which is a foundation of building lifecycle-oriented BIM application.
【Key words】 building lifecycle; building information modeling; BIM construction; information integration; BIM database;
- 【文献出处】 图学学报 ,Journal of Graphics , 编辑部邮箱 ,2017年01期
- 【分类号】TU17
- 【被引频次】36
- 【下载频次】439