节点文献
中国铁路“走出去”风险管控研究
Risk Management and Controlling Measures Utilized During Implementation of China Railway’s “Go Global” Strategy
【摘要】 以中国铁路"走出去"面临的风险为研究对象,采用文献研究、调查研究和案例研究相结合的方法,建立了中国铁路"走出去"风险分解结构。以境外建设-经营-转让(BOT)项目前期工作阶段为例,识别中国铁路"走出去"面临的具体风险,确定关键风险,分析其防控对策,并对中国铁路"走出去"风险管控的其他共性对策进行分析,以期为中国铁路"走出去"风险管控提供借鉴。
【Abstract】 Taking China Railway’s "Go Global" risks as the research objectives,and adopting a combination of literature research,investigation,and case study methods,this paper establishes China Railway’s "Go Global" risk breakdown structure.Utilizing the front-end stage of overseas build-operate-transfer(BOT) project as an example,this paper identifies the specific critical risks of China Railway’s "Go Global" strategy,and analyses its preventive measures,as well as other common risk management and controlling measures.It is expected that the research results will provide reference for China Railway’s "Go Global" risk management and controlling.
【Key words】 China Railway’s "Go Global" strategy risk; risk breakdown structure; front-end stage of overseas BOT project; risk man agement and controlling measures;
- 【文献出处】 中国工程科学 , 编辑部邮箱 ,2017年05期
- 【分类号】F125;F532
- 【被引频次】7
- 【下载频次】258