济南市长清110kV青杨变电站水文计算分析
Analysis on hydrologic calculation in Ji’nan Changqing110kV Qingyang Substation
【摘要】 本文通过研究北大沙河洪水对青杨变电站项目站址的影响,分析了站址处50年一遇和100年一遇的洪水水位、历史最高内涝水位及水利规划情况,为变电站建设提供了科学依据。
【Abstract】 In the paper,the influence of Beidasha River flood on project station site of Qingyang Substation is studied. The flood water level of 50-year return period and 100-year return period,the highest waterlogging water level in the history and water conservancy planning situation in the station site are analyzed. Scientific basis is provided for the construction of substation.
- 【文献出处】 中国水能及电气化 ,China Water Power & Electrification , 编辑部邮箱 ,2016年04期
- 【分类号】TV122.3
- 【被引频次】3
- 【下载频次】50