Aiming at the problem that lack of planning coordination for double yard cane scheduling oriented to curved block in shipbuilding,the technical framework came up with job scheduling problem and lifting crane lifting target analysis was proposed.A dynamic allocation rule based on heuristic rules and based on dynamic balance of collaborative task allocation rules was formed.With double crane lifting as the core,the balance allocation mechanism for priority,time coordination decision rules and crane task was f...