For the project scheduling problem of multi-skill resource constraint,a mathematical model with the objective of minimizing project makespan was built.A Genetic Algorithm(GA)with modified serial scheduling generation scheme by considering the resource requirements of two parallel jobs was proposed.At the top level,the job priority list was optimized with GA;at the down level,the modified scheduling generation scheme and the resource substitution algorithm were developed to solve the allocation problem of mu...