Considering complex application requirements of peak operation in power grids,a novel method of peak operation and inter-provincial coordinated electric power distribution was proposed for huge cascade hydropower plants among multiple power grids.Xiluodu-Xiangjiaba cascade hydropower plants were selected for research case.With perspective of coordination on plants and power grids,an optimal operation model was established with minimizing grid residual mean square error as objective.Considering complementary...