永幸河泵站拆除重建中的基坑施工技术问题与措施

Technical Problems and Measures in the Demolition and Reconstruction of the Foundation Pit of the Yongxing River Pumping Station

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 陈方葵何俊孔维本

【Author】 CHEN Fang-kui;HE Jun;KONG Wei-ben;Anhui Shui′an Construction Group Co.,Ltd.;Anhui Water Conservancy Technical College;

【机构】 安徽水安建设集团有限公司安徽水利水电职业技术学院

【摘要】 介绍了永幸河泵站重建工程在整个施工过程中需解决的问题与采取的措施。采取支护、截渗、控制降水、小石子袋固脚排水法、坡面防护等技术措施,保证了新泵站顺利、安全施工,老泵站继续正常、安全运行,取得了明显的经济效益。

【Abstract】 Problems to be solved and measures to be taken in the whole process of the Yongxing River pumping station reconstruction are mainly introduced.Technical measures are taken,such as supporting,seepage cutting,control of precipitation,strengthening footing drainage with small gravel bags,slope protection and so on,so that the new pump station can be built smoothly and safely and the old pumping station run normally and safely.In this way,obvious economic benefits are achieved.

  • 【文献出处】 长江工程职业技术学院学报 ,Journal of Changjiang Institute of Technology , 编辑部邮箱 ,2016年01期
  • 【分类号】TV551.4
  • 【被引频次】1
  • 【下载频次】26
节点文献中: 

本文链接的文献网络图示:

本文的引文网络