节点文献

土石坝加固前后的监测分析及监控模型

Monitoring analysis and monitoring model of earth rock dam before and after reinforcement

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 杨令强马静高蕊

【Author】 YANG Lingqiang;MA Jing;GAO Rui;School of Civil Engineering and Architecture,University of Jinan;School of electrical engineering and automation,University of Jinan;

【机构】 济南大学土木建筑学院济南大学自动化学院

【摘要】 大坝是一种特殊建筑物,及时准确地了解大坝工作性态,确保其安全极为重要。除险加固前后的性态分析,是研究加固措施是否有效的重要手段。本文以大坝除险加固为背景,对大坝安全监测方法进行系统研究,将加固前后数据作为一个系列,对加固前的监测数据采用免记忆推算法,逐步消除其对加固后的数据的影响。以山东某土坝为例,分别对应力和位移监测资料进行分析,研究其加固措施的效果,得出加固前的观测数据对加固后应力和位移的影响规律,给出了加固后监测数学模型。

【Abstract】 Dam is a kind of special buildings. It is very important to the safety of dam. The special natureof the decision must be timely and accurate understanding of dam behavior. In this paper,with the back-ground of dam,dam safety monitoring method has conducted the system research. The before and after rein-forcement data is looked as a series of data. Free memory algorithm has been given to deal with the moni-toring data before consolidation to eliminate its effects on the data after reinforcement gradually. A dam InShandong Province is looked as an example. The reinforcement effect is studied. The law of previous obser-vations how to affect stress and displacement law has got. The displacement and stress monitoring modelwere put forward respectively.

【关键词】 土石坝加固监测
【Key words】 earth damreinforcementmonitor
【基金】 山东省自然科学基金(ZR2012EEM025,ZR2012EEL24,ZR2014EL038);山东省省级水利科研计划(sdslky201301)
  • 【文献出处】 水利学报 ,Journal of Hydraulic Engineering , 编辑部邮箱 ,2015年S1期
  • 【分类号】TV698.1
  • 【被引频次】5
  • 【下载频次】322
节点文献中: 

本文链接的文献网络图示:

本文的引文网络