【摘要】 研究了在盐酸介质中直接浸出拜耳法赤泥高炉炼铁炉渣中的铝,通过正交试验考察了盐酸浓度、反应温度、反应时间等因素对铝浸出率的影响,并通过单因素试验优化了工艺条件。试验结果表明:影响铝浸出率的主要因素依次为盐酸浓度、反应温度和反应时间;铝浸出最佳条件为盐酸浓度8.4mol/L,反应温度90℃,反应时间1h;最优条件下,铝浸出率为85.18%。
【Abstract】 The leaching of aluminum from blast furnace slag of Bayer red mud ironmaking using hydrochloric acid were studied.Orthogonal experiments and single-factor experiments were employed to examine the influences of hydrochloric acid concentration,reaction time and reaction temperature on the aluminum leaching.The results show that the main influence factors on aluminum leaching rate are in the following order hydrochloric acid concentration,reaction temperature,reaction time.The most suitable conditions for the leaching of aluminum are the HCl concentration of 8.4mol/L,the reaction temperature of 90 ℃ and the reaction time of 1h.Under the conditions,the leaching rate of aluminum can reach 85.18%.
【Key words】 blast furnace slag; red mud; hydrochloric acid; aluminum; leaching;
- 【文献出处】 湿法冶金 ,Hydrometallurgy of China , 编辑部邮箱 ,2015年04期
- 【分类号】TF821
- 【被引频次】3
- 【下载频次】158