节点文献
蒲石河抽水蓄能电站技术供水系统调试
Commissioning of Technical Water Supply System of Pushihe Pumped Storage Power Plant
【摘要】 蒲石河抽水蓄能电站技术供水系统具有供水方式复杂、设备先进及供水质量高、末端用户多等特点。蒲石河抽水蓄能电站四台机组尾水充水前后,分别对技术供水系统进行了无水及有水调试,确保了该电站四台机组正常发电。文章根据蒲石河抽水蓄能电站1号机组技术供水系统调试,介绍了该电站技术供水系统的组成、特点和调试方法。
【Abstract】 The cooling water system of Pushihe pumped storage power plant has the characteristics of complex, advanced equipments, high-quality water requirement and many end users. Before and after the draft tube of four sets filling water,the dry test and wet test of the cooling water system is completed to ensure the four sets generate electricity normally. In this paper, according to the commissioning of cooling water system of unit 1, the composition of the cooling water system,characteristics and commissioning process are introduced.
【关键词】 蒲石河抽水蓄能电站;
技术供水系统;
调试;
【Key words】 Pushihe pumped storage power plant; cooling water system; commissioning;
【Key words】 Pushihe pumped storage power plant; cooling water system; commissioning;
【基金】 国家科技支撑计划项目:大型抽水蓄能机组控制系统装置及系统集成技术研发(2011BAF03B03)
- 【文献出处】 大电机技术 ,Large Electric Machine and Hydraulic Turbine , 编辑部邮箱 ,2015年01期
- 【分类号】TV743
- 【下载频次】93