节点文献

某码头工程基桩缺陷复合检测及其加固处理方法

Composite Testing and Reinforcement Treatment Method for Cast-in-pace Pile Defect of A Container Terminal

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【摘要】 判定水下灌注桩是否出现基桩缺陷,应对桩身进行复合检测。该文依据工程自身特点,参照相应规范要求,分析影响结构安全的缺陷成因,判定出桩身缺陷的具体部位,因地制宜地制定出相应的加固处理方法,能有效节约处理工期和加固处理成本。

【Abstract】 The body of the underwater cast-in-pace pile should be compositely tested to judge whether pile defect will occur. Based on the features of the project and related regulations for reference, the defect causes concerning structural safety are analyzed, the specific part of the defect is located and related reinforcement treatment method is come up with accordingly. Thus the time limit of the project and the reinforcement treatment capital can both be effectively saved.

  • 【文献出处】 重庆建筑 ,Chongqing Architecture , 编辑部邮箱 ,2015年04期
  • 【分类号】U655.55
  • 【下载频次】25
节点文献中: 

本文链接的文献网络图示:

本文的引文网络