浅海围堰与软土深基坑支护结构协同设计及应用研究

Combined design and application of cofferdam and supporting structure in shoal excavation engineering

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 赵云朱俊臣李凡秦景

【Author】 ZHAO Yun;ZHU Jun-chen;LI Fan;QIN Jing;Engineering Designand Research Center,IWHR;CNNC Sanmen Nuclear Power CO.;

【机构】 中国水利水电科学研究院工程设计研究中心中核集团三门核电有限公司

【摘要】 以三门核电一期循环冷却排水口工程的基坑开挖为背景,介绍了双排钢板桩围堰和水泥土挡墙结构协同设计技术,并对基坑与围堰整体稳定进行三维数值模拟。同时就钢板桩和挡墙在复杂水文地质条件下,发生的连续变形所采取的针对性加固措施及应用效果进行分析和探讨。实践表明,钢板围堰与水泥土墙协同设计技术有效解决了浅海滩涂区的软土基坑挡潮、支护难题。有关设计及应用分析成果可为类似工程设计、施工提供参考。

【Abstract】 Based on the engineering practice in the foundation pit excavation for circulating cooling water outfall of the first-stage project of Sanmen nuclear power station,the combined design technology of dou-ble-row steel sheet cofferdam and cement retaining wall were introduced in this paper and three-dimension-al numerical simulation of the overall stability of the supporting structure were conducted. The correspond-ing reinforcement measures and their application effects for the continuous deformation of the supporting structure under complex hydrogeological conditions were analyzed and discussed. This engineering practice showed that the combined design technology of double-row steel sheet cofferdam and cement retaining wall effectively solved the difficulty in preventing tide and supporting foundation pit in shoal excavation engineer-ing and could provide technical support for other similar projects.

  • 【文献出处】 中国水利水电科学研究院学报 ,Journal of China Institute of Water Resources and Hydropower Research , 编辑部邮箱 ,2014年02期
  • 【分类号】TV551
  • 【被引频次】8