节点文献

斜拉桥主塔施工应变控制优化分析

Optimization analysis of construction strain control for the main tower of cable-stayed bridge

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 牟善磊苗吉军陈礼刚

【Author】 Mou Shanlei;Miao Jijun;Chen Ligang;School of Civil Engineering,Qingdao Technological University;

【机构】 青岛理工大学土木工程学院

【摘要】 以临沂市开罗大桥工程为例,通过施工应变控制实测数据与有限元分析程序Midas Civil的理论分析数据进行分析,实时监测施工过程,确保在每个施工工况都能够达到合理受力状态,为今后应变施工控制相关工作提供经验及优化措施。

【Abstract】 With the Cairo Bridge of Linyi city as an example,the actual measured data of construction strain control and theoretical analysis data of finite element analysis program Midas-Civil were compared and analyzed to ensure that,every construction condition could reach the reasonable stress state during the monitoring construction process,which can provide experience and optimization measures for future strain construction control.

【关键词】 斜拉桥主塔应变
【Key words】 cable-stayed bridgemain towerstrain
  • 【文献出处】 工程建设 ,Engineering Construction , 编辑部邮箱 ,2014年01期
  • 【分类号】U448.27;U445.4
  • 【被引频次】3
  • 【下载频次】52
节点文献中: 

本文链接的文献网络图示:

本文的引文网络