节点文献

老挝塞坎曼2水电站开发方案研究

Study on development scheme of Xe Kaman 2 Hydropower Station in Laos

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 李凯朱小春王孟铁刘立民

【Author】 LI Kai;ZHU Xiaochun;WANG Mengtie;LIU Limin;China International Water & Electric Corp.;

【机构】 中国水利电力对外公司

【摘要】 针对老挝塞坎曼2(Xe Kaman 2)水电站开发项目受上、下游已建、在建水电站的影响,选址空间有限,且河道比降较小,局限了开发方案的选择等问题,通过多次勘查、测量、分析研究,从技术、经济、环境等方面综合比较了两种可能的坝址和厂房位置,最终确定了该电站的开发方案,奠定了项目开发的基础。

【Abstract】 Aiming at the problems from the development project of Xe Kaman 2 Hydropower Station in Laos those confine the selection of the development scheme,i. e. the impacts from both the upstream and the downstream hydropower stations existed and under construction,the limited space for the site selection,the less river gradient,etc.,a comprehensive comparison between two possible dam sites and powerhouse locations is made in the aspects such as technology,economy,environment,etc. through repeated investigation,survey and analysis,and then the development scheme of the hydropower is finally determined,which lays the basis for the project development.

  • 【文献出处】 水利水电技术 ,Water Resources and Hydropower Engineering , 编辑部邮箱 ,2014年09期
  • 【分类号】TV72
  • 【被引频次】2
  • 【下载频次】35
节点文献中: 

本文链接的文献网络图示:

本文的引文网络