巴嘎乌图布拉格水库除险加固工程坝料设计中的问题和解决方案
Problems in design of dam construction materials for risk-elimination and strengthening project of Bagawuturague Reservoir and its solving scheme
【摘要】 针对新疆和布克赛尔蒙古自治县巴嘎乌图布拉格水库坝料设计中的填筑料的压实质量问题,经现场察勘以及对综合坝料、原坝体、坝基、料场复查和现场碾压试验等成果进行充分分析研究和反复比对,提出了初步解决方案,旨在对今后工程处理类似问题提供借鉴参考。
【Abstract】 Aiming at the design of the construction material for the dam of Bagawuturague Reservoir in Hobukesel Mongolia Autonomous County in Xinjiang,a preliminary solving scheme is put forward herein through the full analysis and the repeated comparison made on the results from the site investigation and the recheck on the composite materials for dam construction,the original dam body and foundation,raw material yard as well as the in situ rolling compaction experiment,so as to provide some references for the treatment on the similar problem for the project in the days to come.
【关键词】 除险加固;
小型水库;
坝料设计;
解决方案;
新疆;
【Key words】 risk-elimination and strengthening; small reservoir; design of dam construction materials; solving scheme; Xinjiang;
【Key words】 risk-elimination and strengthening; small reservoir; design of dam construction materials; solving scheme; Xinjiang;
- 【文献出处】 水利水电技术 ,Water Resources and Hydropower Engineering , 编辑部邮箱 ,2014年04期