工业及采暖热负荷同时需求的350MW超临界供热机组装机方案研究

Study on installing project of 350 MW supercritical unit based on industrial and heating load demand

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 李辉杨立辉

【Author】 LI Hui;YANG Li-hui;Hebei Electric Power Design & Research Institute;

【机构】 河北省电力勘测设计研究院

【摘要】 介绍了邢台热电厂供热机组承担的采暖和工业热负荷情况,以解决4.0 MPa压力等级工业蒸汽为主线,配置四种装机方案进行对比分析,认为采用350 MW超临界机组再热热段抽汽+外置式蒸汽冷却器为最佳方案。

【Abstract】 The condition of heat and industry load of Xingtai thermal power plant was introduced,in order to solve the4. 0MPa pressure level industrial steam as the main line. Four feasibility schemes were proposed and comparativly analyzed,and it was considered that hot reheat steam extraction and outside steam cooler of 350 MW supercritical unit was the best solution.

  • 【文献出处】 能源工程 ,Energy Engineering , 编辑部邮箱 ,2014年04期
  • 【分类号】TM621
  • 【被引频次】1
  • 【下载频次】104