工业及采暖热负荷同时需求的350MW超临界供热机组装机方案研究
Study on installing project of 350 MW supercritical unit based on industrial and heating load demand
【摘要】 介绍了邢台热电厂供热机组承担的采暖和工业热负荷情况,以解决4.0 MPa压力等级工业蒸汽为主线,配置四种装机方案进行对比分析,认为采用350 MW超临界机组再热热段抽汽+外置式蒸汽冷却器为最佳方案。
【Abstract】 The condition of heat and industry load of Xingtai thermal power plant was introduced,in order to solve the4. 0MPa pressure level industrial steam as the main line. Four feasibility schemes were proposed and comparativly analyzed,and it was considered that hot reheat steam extraction and outside steam cooler of 350 MW supercritical unit was the best solution.
【关键词】 装机方案;
蒸汽冷却器;
再热热段抽汽;
【Key words】 installing project; steam cooler; hot reheat steam extraction;