节点文献

观音阁坝变形监测的难点及解决方案

Guanyinge dam deformation monitoring difficulties and solutions

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 李延超袁雪莲田作佳王志忱

【Author】 Li Yan-chao;Yuan Xue-lian;Tian Zuo-jia;Wang Zhi-chen;

【机构】 辽宁省观音阁水库管理局辽宁省水利水电科学研究院

【摘要】 为解决观音阁水库碾压混凝土大坝安全监测中坝顶变形监测的数据采集系统布置与水工结构冲突等问题,从多方案比较中择优确定,通过对多个基准传递等问题的综合研究,选择监测基线布置方案,形成了监测要素的工程关联,解决了变形监测的系统布置设计难点,实现了基于自动化的碾压混凝土坝全面的变形安全监测。

【Abstract】 To solve data acquisition system layout and hydraulic structures and other issues of conflict during safety monitoring of the dam crest deformation in Guanyinge Reservoir RCC from the multi-program compari-son merit determined by a number of benchmark issues such as integrated delivery research,select a baseline monitoring program arranged to form an association to monitor the project elements to solve the difficulties of deformation monitoring system layout design,to achieve a comprehensive safety monitoring deformation of roller compacted concrete dam based automation.

【基金】 辽宁省科学技术农业攻关计划项目:辽宁省防汛调度管理系统研究[2011216001]
  • 【文献出处】 吉林水利 ,Jilin Water Resources , 编辑部邮箱 ,2014年05期
  • 【分类号】TV698.11
  • 【下载频次】33
节点文献中: 

本文链接的文献网络图示:

本文的引文网络