1000MW超超临界发电机组点火油系统设计优化
1000MW Ultra-supercritical Turbine Oil System Optimization Design of Ignition
【摘要】 文中结合新海发电有限公司老厂现有情况,基于"可行性、可靠性、经济性"三大原则,对新海发电有限公司新建2×1000 MW超超临界燃煤机组点火油系统设计、供油泵容量及配置、卸油设施的配置以及油罐容量的配置进行充分论证,提出点火油系统设计优化方案,既节约工程投资,也节约今后运行成本。
【Abstract】 With the development of 1000MW Ultra-supercritical units will become the main units in power construction and development of our country,million ultra-supercritical break the conventional design has become an inevitable.In this paper,combined with the new old factory existing power generation Co.Ltd.,based on ’the feasibility,reliability,economy’ of the three major principles,in Xinhai Power Company Limited of 2 x 1000MW supercritical coal-fired unit ignition oil system design,pump capacity and allocation,unloading facilities and configuration of tank capacity is analyzed in detail,put forward the optimized design scheme of ignition oil system,not only saving engineering investment,but also save the operation cost.
- 【文献出处】 应用能源技术 ,Applied Energy Technology , 编辑部邮箱 ,2013年07期
- 【分类号】TM621
- 【下载频次】49