节点文献

引水式电站过渡过程研究

Research on the transient process of the diversion-type power station

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 徐武林王煜

【Author】 XU Wu-lin;WANG Yu;Faculty of Metallurgical and Energy Engineering,Kunming University of Science and Technology;

【机构】 昆明理工大学冶金与能源学院

【摘要】 随着水电发展逐步成熟,水电事业也开始向山区河流发展,促进了中小型水电站数量的增加,因此引水式电站过渡过程的研究已经引起了广泛的关注.概述了引水式电站过渡过程的研究内容和研究现状,以及过渡过程中遇到的主要问题和主要改善措施,同时针对不同类型的调压室,就调压阀和导叶关闭规律在引水式电站过渡过程中的应用作了详细论述,通过实例针对不同类型的引水式电站简要分析了其选择条件、注意事项以及设置过程.

【Abstract】 With the increase in the number of medium and small hydropower station built in mountain areas,research on the transient process of the diversion-type power station has caused wide attention.In this paper,research status of transient process of the diversion-type power station was sketched,and the main problems encountered in the transient process and the main improvement measures were discussed.The application of the pressure regulating valve and guidevane shut-off rules to the transient process of the diversion-type power station was discussed in detail for different types of surge chamber.The selection criteria,matters needing attention and the setup process of the pressure regulating valve and guide-vane were analyzed briefly by case study for different types of diversion-type power station.

  • 【文献出处】 能源研究与信息 ,Energy Research and Information , 编辑部邮箱 ,2013年03期
  • 【分类号】TV737
  • 【被引频次】8
  • 【下载频次】104
节点文献中: 

本文链接的文献网络图示:

本文的引文网络