节点文献

软岩隧道掌子面挤出与拱顶沉降变形相关性

Correlation Between Extrusion Deformation of Tunnel Face and Settlement Deformation of Tunnels in Soft Ground

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 朱得华梁斌李治国

【Author】 ZHU Dehua 1,LIANG Bin 1,LI Zhiguo 2(1.Planning & Architectural Engineering School,Henan University of Science & Technology,Luoyang 471023,China;2.China Railway Tunnel Group Co.Ltd.,Luoyang 471009,China)

【机构】 河南科技大学规划与建筑工程学院中铁隧道集团有限公司

【摘要】 依托某通过水平旋喷超前加固后实现了大断面开挖的软弱围岩铁路隧道,通过在掌子面和掌子面后方拱顶布设监测点,进行相关项目的量测。按照施工组织情况,建立计算模型,设计相应的计算工况。基于实测结果和数值模拟结果,研究掌子面挤出变形、拱顶沉降变形与仰拱跟进距离之间的关系,分析掌子面挤出变形与拱顶沉降变形之间的相关性,为其后续施工和工法改进提供了数据支持和参考。

【Abstract】 Taking a railway tunnel with large-section excavation made by advanced reinforcement of horizontal rotational jet grouting pile in soft rock mass as an example,the relative monitoring items were carried out by installing the monitoring points both on tunnel face and back crown.The model and cases for calculating were designed according to construction organization.The relationships of extrusion deformation on tunnel face and crown settlements versus follow-up distance of inverted arch were studied,and the dependency between extrusion deformation and crown settlement was analyzed.The results offer references to subsequent construction and method improvement.

【基金】 铁道部科技研究开发计划重大课题(2011G004)
  • 【文献出处】 河南科技大学学报(自然科学版) ,Journal of Henan University of Science & Technology(Natural Science) , 编辑部邮箱 ,2013年03期
  • 【分类号】U456.3
  • 【被引频次】13
  • 【下载频次】249
节点文献中: 

本文链接的文献网络图示:

本文的引文网络