节点文献

蚂蚁锌矿伪倾斜削壁充填法优化

Optimization of Pseudo Inclined Waste-lifting Stoping Mayi Zinc Mine

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 林友王连森况世华王育军

【Author】 LIN You1,WANG Lian sen2,KUANG Shi hua1, WANG Yu jun1(1.Faculty of Mining Industry,Kunming Metallurgy College,Kunming,Yunnan 650033,China; 2.Baoshan Minsheng Safety Evaluation Co.Ltd, Baoshan,Yunnan 678000,China)

【机构】 昆明冶金高等专科学校矿业学院保山民生安全评价有限公司

【摘要】 针对蚂蚁锌矿的具体情况,对原削壁充填采矿方案进行了优化,提出了伪倾斜面布置采场的方案,并在矿山进行了采矿实践。结果表明,该方法可减少大量采准切割工程,提高矿石回收率及回采效率,降低采矿成本,具有较高的应用价值与经济效益。

【Abstract】 In view of the concrete conditions of Mayi Zinc Mine,the original scheme of waste-lifting stoping was optimized,and a mining scheme of pseudo inclined stope layout was designed,and was practiced in the mine,the result showed that it could reduce a lot of cutting and preparation engineering,increase ore recovery and extracting efficiency,and cut down mining cost,so it has high application value and good economic benefits.

  • 【文献出处】 矿业研究与开发 ,Mining Research and Development , 编辑部邮箱 ,2013年02期
  • 【分类号】TD853.3
  • 【被引频次】7
  • 【下载频次】77
节点文献中: 

本文链接的文献网络图示:

本文的引文网络