节点文献
高压旋喷锚杆的试验研究
Test Study on High-pressure Rotary Jet Grouting Bolt
【摘要】 本文结合天津市滨海新区某文化广场工程,在软土地质条件下,基坑采用钢筋混凝土桩加高压旋喷锚杆进行围护的施工工艺,需进行可行性试验。试验方法遵循《建筑基坑支护规程》(JGJ120-2012)中的规定,通过选用的5根锚杆进行试验数据分析。高压旋喷锚杆的锚固段强度较低,易造成锚杆的弹性变形较小,塑性变形较大,且蠕变系数偏大,因此,在软土地区采用高压旋喷锚杆工艺时,为满足锚固力需求,应加长锚固段的长度,并在原施工工艺中做部分改进,才能达到在软土地区应用高压旋喷锚杆的目的。
【Abstract】 Based on the engineering of a Cultural Plaza of Binhai New Area in Tianjin,it is a kind of construction process in soft soil in which the foundation pits are supported by reinforced concrete piles and high-pressure jet grouting anchor bolts.Since it is the first time that high-pressure jet grouting anchor bolts are applied in soft soil,some kinds of feasibility experiments are necessary.The methods used in the experiment adhere to national rules in JGJ120-2012.According to experimental statistics analysis from 5 anchor bolts,as the strength of anchorage segment in the high-pressure jet grouting anchor bolt is relatively low,the bolt is usually with small elastic deformation and big plastic deformation,and the creep factor is too high.So,when applying high-pressure jet grouting anchor bolts to soft soil,in order to generate enough anchorage force,the anchorage segment should be lengthened and other improvements in the construction process should be made.
【Key words】 high-pressure rotary jet grouting bolt; bolt; basic test; creep test;
- 【文献出处】 建筑科学 ,Building Science , 编辑部邮箱 ,2013年07期
- 【分类号】TD353.6
- 【被引频次】4
- 【下载频次】100