330MW蒸发冷却汽轮发电机转子穿装工艺
Rotor Installation Process of 330 MW Evaporative Cooling Turbine Generator
【摘要】 蒸发冷却技术是我国自主研发的新型冷却技术,由于发电机定子采用全浸泡式蒸发冷却,其结构同常规发电机有很大的不同,其装配工艺也不同。文章主要介绍了330MW蒸发冷却汽轮发电机厂内总装时转子穿装的工艺方案的制定和实施。
【Abstract】 Evaporative cooling was a new cooling technology developed by our country. Because of the totalimmersion evaporative cooling for the generator stator, the generator’s structure differed from normal ones. So the assembly process had to be reconsidered. The formulate and implement of the rotor installation process for 330 MW evaporative cooling turbine generator was introduced.
- 【文献出处】 电机技术 ,Electrical Machinery Technology , 编辑部邮箱 ,2013年01期
- 【分类号】TM311
- 【下载频次】69