节点文献

渭河与千河支流交汇堤防加固设计施工

On Design and Execution of the Dyke Strengthening Works on Intersection of Weihe River and Qianhe River

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 卜贵贤卜少峰崔建军

【Author】 BU Gui-xian1,BU Shao-feng2,CUI Jian-jun3(1.Yangling Vocational and Technical College,Yangling,Shaanxi 712100,China; 2.Baoji River Management Service,Baoji,Shaanxi 721008,China; 3.Baoji Hydraulic & Hydroelectric Planning,Reconnaissance and Design Institute,Baoji,Shaanxi 721000,China)

【机构】 杨凌职业技术学院宝鸡市河务管理处宝鸡市水利水电规划勘测设计院

【摘要】 针对渭河与一级支流千河交汇处的河势复杂性特点,就其河堤堤顶高程、抗冲护坡护底设计与河堤施工方法进行了阐述与探讨。

【Abstract】 Based on the complicacy of river regime at intersection of Weihe River and Qianhe River,the first level tributary of Weihe River,the issues such as embankment top elevation,the structural designs of impact-resistant dyke revetment and bottom protection,and dyke construction methods are discussed in this paper.

  • 【文献出处】 杨凌职业技术学院学报 ,Journal of Yangling Vocational & Technical College , 编辑部邮箱 ,2012年04期
  • 【分类号】TV871.1
  • 【被引频次】1
  • 【下载频次】35
节点文献中: 

本文链接的文献网络图示:

本文的引文网络