节点文献
李杖子水库存在问题分析及除险加固方案选择
Problems analysis and Reinforcement scheme selection in Lizhangzi Reservoir
【摘要】 首先说明了大坝、溢洪道和输水洞等工程的现状和存在的问题,然后,从洪水标准和坝体边坡稳定两个方面进行了复核,进而对工程主体建筑物和金属结构提出了除险加固方案。
【Abstract】 This paper firstly explained the present situation and the existing problems of embankment,spillway and water conveyance tunnel,etc.Then,the design reviewed flood standards and dam slope stability,and Reinforcement scheme about main works buildings and metal structure was proposed.
- 【文献出处】 中国科技信息 ,China Science and Technology Information , 编辑部邮箱 ,2012年12期
- 【分类号】TV697.3
- 【下载频次】13