高层桩基础压桩中异常现象研究

Issues Encountered in the Jacked PHC Pile Installation

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 叶永盛石宇熙

【Author】 YE Yongsheng1,SHI Yuxi2(1.The Third Construction Engineering Company Ltd.,Dongyang Zhejiang 322100; 2.Jiangsu Normal University of Technology,Changzhou Jiangsu 213001)

【机构】 浙江省东阳第三建筑工程有限公司江苏技术师范学院

【摘要】 对桩基施工中出现大面积爆桩及桩头破碎现象进行研究,对部分桩因压力过大,桩头高出设计标高及开挖出现泉眼等问题进行分析,并对桩基施工出现的异常现象提出了补救措施。

【Abstract】 This paper presents the issues that encountered in the jacked Pre-stressed High Strength Concrete(PHC) pile for a high-raised building.These abnormal problems,such as,pile shaft burst due to excessive compression pressure;broken pile head;significantly higher than the target pile tip elevation as well as burst of groundwater after the pile installation,are discussed in the paper.Measures that mitigate these abnormals are also proposed.

【关键词】 桩基础异常分析
【Key words】 Pile FoundationsAbnormalConstruction Analysis