节点文献
江苏省新沭河治理三洋港枢纽工程钢筋混凝土地下连续墙施工技术
Construction Technology of Reinforced Concrete Diaphragm Wall in SanYang Port Hub Project,New Shuhe Treatment Project
【摘要】 介绍新沭河治理工程三洋港枢纽工程沿海复杂地质条件下钢筋混凝土地下连续墙施工技术,并详细阐述其关键工序质量控制措施。实践证明本工程采用钢筋混凝土地连墙施工工艺适用于沿海地下水变化范围大、土质复杂条件,同时可有效地保持挖掘面的稳定,可以为类似工程施工提供借鉴。
【Abstract】 Introducing reinforced concrete diaphragm wall construction technology of Sanyang Port Hub Project,New Shuhe Treatment Project under coastal complicated geological conditions,and elaborating the key process quality control measurement.The practice has proved that reinforced concrete diaphragm wall construction technology which used by the project is suited for large range of coastal groundwater and complicated conditions of soil.Meanwhile,this kind of techonology can be used to maintain the stability of surface mining effectively,provide a reference for those similar construction projects.
【Key words】 sanyang port hub project; diaphragm wall; construction technology; quality control;
- 【文献出处】 江苏建筑 ,Jiangsu Construction , 编辑部邮箱 ,2012年02期
- 【分类号】TU753
- 【下载频次】38