湘潭二期1×600MW机组降压送出系统研究
Study on Scheme of Connecting Xiangtan Power Plant StageⅡ1×600MW Generating Unit to Hunan Power Grid with Lower Voltage
【摘要】 为符合国家节能减排政策,降低系统网损,并缓解云田500kV变下网压力,湘潭二期1×600MW机组降压送出工程将在2012年实施。研究表明,湘潭二期1×600MW机组通过1回220kV大截面导线接入白马垄220kV变电站是适宜的。
【Abstract】 To fulfiill the country policy of energy conservation and emission reduction,lower network loss,and alleviate the supply pressure of Yuntian 500kV substation,Xiangtan power plant stageⅡ1×600MW generating unit is going to connect to the Hunan power grid with lower voltage in 2012.The study shows it is feasible that Xiangtan power plant stageⅡ1×600MW generating unit connects to Baimalong 220kV substation with one 220kV big cross section tranmission line.