阿什河橡胶坝工程布置及坝袋相关设计
Project Layout and Relevant Design of Dam Bag for Ashen River Rubber Dam
【摘要】 橡胶坝工程位于阿什河干流上,位于右岸桩号6+200位置处,是防洪结合拦河蓄水,以形成雍水水面,达到改善河流的自然景观的目的,属美化城市景观的水利工程。设计中要满足50 a一遇洪水宣泄要求,还要防止泥沙卷入坝袋底部增加磨损,有利于管理。
【Abstract】 The rubber dam project is situated on the main stream of the Ashen River,at the pile No.6+200 of the right bank,and it is to form a backwater surface by combing flood control with water storage by blocking the river to realize improving the natural landscape of the river.The project is a hydraulic project beautifying urban landscape.In the design,the demand for 50-year flood needs to be met,and also need to prevent sediment flowing into the bottom of dam bags so as to make it easy for us manage the project.
【关键词】 橡胶坝;
总体布置;
充水式坝袋;
锚固;
水泵选型;
【Key words】 rubber dam; general layout; type of water filling; dam bag; anchoring; pump type selection;
【Key words】 rubber dam; general layout; type of water filling; dam bag; anchoring; pump type selection;
- 【文献出处】 黑龙江水利科技 ,Heilongjiang Science and Technology of Water Conservancy , 编辑部邮箱 ,2012年01期
- 【分类号】TV644
- 【下载频次】84