节点文献

阿什河橡胶坝工程布置及坝袋相关设计

Project Layout and Relevant Design of Dam Bag for Ashen River Rubber Dam

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 王波

【Author】 WANG Bo(Heilongjiang Provincial Water Conservancy & Hydroelectric Power Investigation, Design and Research Institute,Harbin 150080,China)

【机构】 黑龙江省水利水电勘测设计研究院

【摘要】 橡胶坝工程位于阿什河干流上,位于右岸桩号6+200位置处,是防洪结合拦河蓄水,以形成雍水水面,达到改善河流的自然景观的目的,属美化城市景观的水利工程。设计中要满足50 a一遇洪水宣泄要求,还要防止泥沙卷入坝袋底部增加磨损,有利于管理。

【Abstract】 The rubber dam project is situated on the main stream of the Ashen River,at the pile No.6+200 of the right bank,and it is to form a backwater surface by combing flood control with water storage by blocking the river to realize improving the natural landscape of the river.The project is a hydraulic project beautifying urban landscape.In the design,the demand for 50-year flood needs to be met,and also need to prevent sediment flowing into the bottom of dam bags so as to make it easy for us manage the project.

  • 【文献出处】 黑龙江水利科技 ,Heilongjiang Science and Technology of Water Conservancy , 编辑部邮箱 ,2012年01期
  • 【分类号】TV644
  • 【下载频次】84
节点文献中: 

本文链接的文献网络图示:

本文的引文网络