节点文献

生物绳填料-湿地植物联合净化低污染废水

Purification of low pollution wastewater by the combined biological rope packing-wetland plant process

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 邹联沛温从汉孙瑞茹王欣泽

【Author】 Zou Lianpei1,Wen Conghan1,Sun Ruiru1,Wang Xinze2(1.Department of Environmental Science,Shanghai University,Shanghai 200444,China; 2.Department of Environmental Science and Engineering,Shanghai Jiaotong University,Shanghai 200240,China)

【机构】 上海大学环境科学系上海交通大学环境科学与工程学院

【摘要】 针对汇入洱海的支流低污染的水质情况,选择新型生物绳填料和挺水植物组成的折流式人工湿地去除水中低浓度氮磷。对照试验结果表明,种有水葱的装置A和无水葱的装置B构成的人工湿地系统对TN的平均去除率分别为48.3%和40.2%,对TP的平均去除率分别为65.8%和55.9%,对CODMn的平均去除率分别为75.2%和74.8%,系统对水体的整体处理效果理想,出水达到国家Ⅲ类水质标准。

【Abstract】 According to the water quality conditions of the slightly polluted anabranch,which flows into the Erhai,a new type of biological rope packing and water plants have been selected build up the folds flow constructed wetlands so as to remove nitrogen and phosphorus from slightly polluted water.The contrast results show that the average TN removing rate by using constructed wetland system A which has been planted with scirpus tabernaemontani,is 48.3% and by using constructed wetland system B which has not been planted with scirpus tabemaemontani,is 40.2%.The average TP removing rates of system A and B are 65.8% and 55.9%,respectively.The average CODMn removing rates of system A and B are 75.2% and 74.8%,respectively.The removing effects of the systems on water quality are satisfactory,reaching the 3rd class national standard.

【基金】 “十一五”国家重大水专项(2009ZX07105-003)
  • 【文献出处】 工业水处理 ,Industrial Water Treatment , 编辑部邮箱 ,2012年12期
  • 【分类号】X703
  • 【被引频次】5
  • 【下载频次】205
节点文献中: 

本文链接的文献网络图示:

本文的引文网络