BOT项目投资与特许权期的二维招标合同设计
The Effect of Two-dimensional Tender Contract Design on Investment and Concession Term for BOT Projects
【摘要】 为让管理水平较高的私营集团获得BOT项目特许权,并实现项目社会福利最大,本文利用机制设计理论建立了一个关于BOT项目投资与特许权期的二维招标合同的直接机制模型。通过模型分析,获得了该招标机制的可行性条件,最优形式和相应配置方案,并由一个算例表明,得到的最优招标机制在实际中是有效的。所获结果为政府对BOT特许权招标提供了一种理论指导和实际方法。
【Abstract】 Tendering and bidding are two important trading mechanisms.However,many Build-Operate-Transfer(BOT) projects are having issues with the concession bid.For instance,private groups sometimes falsify bidding information in order to win a bid from Chinese government.Therefore,it is important to redesign tendering and bidding mechanisms in order to maximize the social welfare of a BOT project.There is a lack of study on concession tender issues for BOT projects.This paper investigates a two-dimensional tender problem associated with BOT project’s investment and concession period.We also consider the effect of the concession period on the private investment in the tendering practice. A direct tendering mechanism model on BOT project’s investment and concession period is proposed according to the mechanism design theory.The proposed model can help derive the feasible condition,optimal form,and corresponding distribution program for the implementation of tendering mechanism.Firstly,it is difficult for the government to know the private group’s information,such as the management level in the tendering process.A direct tendering mechanism model on the BOT project’s investment and concession term is proposed.The model enables us to obtain the optimal direct tender mechanism and test its feasibility. Secondly,to select the private group with the highest management level for the project implementation,the distribution program for the BOT project’s concession tender is discussed based on the analysis of optimal direct tender mechanism.The discussion results indicate that the BOT concession tender with the inclusion of the competing bidding variable can not only help the government choose a private investor with the highest management level from the fury competing market,but also maximize the project’s benefits. Finally,the analysis of a computing example shows that the obtained conclusions not only are valid and applicable,but also provide the government with a theoretical guidance and a practical approach for implementing BOT project’s concession tender.
【Key words】 BOT project; project investment; concession term; tender contract; optimal mechanism;
- 【文献出处】 管理工程学报 ,Journal of Industrial Engineering and Engineering Management , 编辑部邮箱 ,2012年03期
- 【分类号】F224;F283
- 【被引频次】15