Taking the mining of the 2# hanging wall ore in Daye Iron Mine by a filling method as an engineering background,the change of high-steep slope stability in the mining process was analyzed first in this paper.Then through using on-site monitoring together with similar material simulate experiments,the stress and displacement changing rules of rock pillars and surrounding rock were studied to discuss the effect of mining the hanging wall ore using the filling method on the surrounding rock stability.The resul...