节点文献
提高病房楼电梯运输能力的解决方案
Solutions on Improving the Transportation Capacity of the Ward Building Elevator
【摘要】 本文提出了提高电梯综合运输能力的主要方法,即减少停站及合理设置停站的观点,并结合实例,通过设置不同的电梯停站方案,对其进行现场测量、计算、对比和分析,选出了综合运输能力最佳的停站方案。
【Abstract】 This paper presents a comprehensive transportation capacity to improve the elevator is the primary means to reduce stops and a reasonable set stopping point, this combination of practical examples, by setting different elevator stops the program, its on-site measurement, calculation, comparison and analysis, selection out a comprehensive transport capacity of the program the best stops to view the article proved the correctness of the final proposed ward floor elevator runningflat full capacity, how to improve the transport capacity of the solution.
- 【文献出处】 中国医院建筑与装备 ,Chinese Hospital Architecture & Equipment , 编辑部邮箱 ,2011年01期
- 【分类号】TU857
- 【被引频次】1
- 【下载频次】85