节点文献

“无项目”情况下铁路运量预测方法研究

Research on Railway Traffic Volume Forecast Method under "No Project" Situation

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 梅志兴马保成

【机构】 兰州交通大学兰州铁路局

【摘要】 在"有无对比法"当中,"无项目"情况下运输系统的变化情况,主要取决于地方政府以及相关投资主体的投资意愿和能力。此文选取国民生产总值(GDP)增长率及运输系统改造投资额占国民生产总值的比重作为自变量,用以体现投资意愿和能力,通过BP神经网络训练映射出与货运量复杂的非线性的映射关系,从而得到相应情况下铁路运量的预测值,并通过实例进行验证。

【Abstract】 In the "with and without comparison method",the transportation system changes under the situation of no project mainly depended on local government and related investment main body’s investment willingness and ability.This article selects gross national product(GDP) growth rate and the transport system transformation investment as a share of gross domestic product as the independent variable to represent the investment willingness and ability.We mapped out the complicated nonlinear mapping relation through the BP neural network training,from which we got corresponding railway freight volume predictive value.The result was verified by practical examples.

  • 【文献出处】 铁路工程造价管理 ,Railway Engineering Cost Management , 编辑部邮箱 ,2011年06期
  • 【分类号】U294.13
  • 【下载频次】69
节点文献中: 

本文链接的文献网络图示:

本文的引文网络